FAU 4517 (A ST) over DRAINAGE CANAL
100 FT N OF KIOWA · County 121, Oklahoma · Built 1950 · 2 Lanes · 1,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
34.928903, -95.773372
This bridge is in worse condition than 64.2% of bridges in County 121. The average bridge in Oklahoma is 0 years old; this one is 76 years old.
Nearby Bridges
N4068 (B ST) over CANAL
Built 1975
N4067 (C ST) over CANAL
Built 1975
N4072 (2 ND ST) over DRAINAGE CANAL
Built 1975
N4067 (D ST) over DRAINAGE CANAL
Built 1975
FAU 4488 (WASHINGT over U.P. R.R. UNDER
Built 1939
FAU 4511 (F ST) over CANAL
Built 1950
FAU 4529 (6 ST) over DRAINAGE CANAL
Built 1950
N4075 (7 ST.) over DRAINAGE CANAL
Built 1946
U.S. 270 over CREEK
Built 1929
E1443 (COMANCHE over DRAINAGE CANAL
Built 1975
Bridge Details
- Structure #
- 117290000000000
- Year Built
- 1950
- Length
- 10.1 m (33.1 ft)
- Max Span
- 9.1 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 1,500
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $177,000
- Total Project Cost
- $281,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.