E0880 over CREEK

1S 2.3E MILFAY · County 037, Oklahoma · Built 1950 · 1 Lanes · 100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 4 Poor
Superstructure 4 Poor
Substructure 5 Fair

Location

35.740692, -96.524561

This bridge is in worse condition than 81.4% of bridges in County 037. The average bridge in Oklahoma is 0 years old; this one is 76 years old.

Nearby Bridges

Bridge Details

Structure #
115680000000000
Year Built
1950
Length
8.7 m (28.5 ft)
Max Span
6.9 m
Width
5.8 m (19 ft)
Lanes
1
Daily Traffic
100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$162,000
Total Project Cost
$256,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.