E1380 over CREEK

8. N 1. E OF REED · County 055, Oklahoma · Built 1950 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 5 Fair
Substructure 5 Fair

Location

35.016356, -99.677286

This bridge is in worse condition than 95.2% of bridges in County 055. The average bridge in Oklahoma is 0 years old; this one is 76 years old.

Nearby Bridges

Bridge Details

Structure #
113300000000000
Year Built
1950
Reconstructed
1995
Length
8.5 m (27.9 ft)
Max Span
4.1 m
Width
6.6 m (21.7 ft)
Lanes
2
Daily Traffic
50
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$162,000
Total Project Cost
$256,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.