4632C/ N3960 over CREEK

10.8N;4W OF HANNA · County 091, Oklahoma · Built 1950 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
112460000000000
Year Built
1950
Length
7 m (23 ft)
Max Span
6.1 m
Width
5.6 m (18.4 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$136,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.