U.S. 271 over FOURCHE MALINE CREEK

26 MI N PUSHMATAHA CO · County 079, Oklahoma · Built 1948 · 2 Lanes · 1,800 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
109610000000000
Year Built
1948
Length
139.3 m (457 ft)
Max Span
64 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,800
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,064,000
Total Project Cost
$2,980,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.