N2835 (9 ST) over LINE CREEK

1 BLK N OF US62 ON 9TH ST · County 051, Oklahoma · Built 1948 · 2 Lanes · 2,463 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
109220000000000
Year Built
1948
Length
30.2 m (99.1 ft)
Max Span
9.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
2,463
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$317,000
Total Project Cost
$506,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.