S.H. 7 over ROCK CREEK
8.3 MI E JCT US77 · County 099, Oklahoma · Built 1947 · 4 Lanes · 14,100 vehicles/day
Overall
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
34.506322, -97.051233
This bridge is in worse condition than 60.9% of bridges in County 099. The average bridge in Oklahoma is 0 years old; this one is 79 years old.
Nearby Bridges
S.H. 7 over GUY SANDY CREEK
Built 2022
S.H. 7 over GUY SANDY CREEK
Built 1978
S.H. 7 over DRY SANDY CREEK TRIB.
Built 1951
E1737 over DRY SANDY CREEK
Built 2003
S.H. 110 over DRY SANDY CREEK
Built 1974
N3330 (SUNSHINE) over CHIGLEY SANDY CR TRIB
Built 2022
E1710 over GUY SANDY CREEK
Built 1988
S.H. 7 over CREEK
Built 1940
CO. RD. N3370 over S.H. 7 SPUR UNDER
Built 1991
N3310 over CHIGLEY SANDY CREEK
Built 1996
Bridge Details
- Structure #
- 107300000000000
- Year Built
- 1947
- Length
- 43.3 m (142.1 ft)
- Max Span
- 17.1 m
- Width
- 18.3 m (60 ft)
- Lanes
- 4
- Daily Traffic
- 14,100
- Material
- Concrete Continuous
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $987,000
- Total Project Cost
- $2,762,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.