E0110 over ELM CREEK

3N 6.3E OF SH11/US81 · County 053, Oklahoma · Built 1945 · 2 Lanes · 24 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

36.854336, -97.619664

This bridge is in worse condition than 88.1% of bridges in County 053. The average bridge in Oklahoma is 0 years old; this one is 81 years old.

Nearby Bridges

Bridge Details

Structure #
101780000000000
Year Built
1945
Length
6.8 m (22.3 ft)
Max Span
6.7 m
Width
5.5 m (18 ft)
Lanes
2
Daily Traffic
24
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$146,000
Total Project Cost
$230,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.