S.H. 54 over EAST OTTER CREEK

8.9 MI N U.S. 62 · County 075, Oklahoma · Built 1941 · 2 Lanes · 460 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 5 Fair

Location

34.763064, -98.861375

This bridge is in worse condition than 92.9% of bridges in County 075. The average bridge in Oklahoma is 0 years old; this one is 85 years old.

Nearby Bridges

Bridge Details

Structure #
097890000000000
Year Built
1941
Reconstructed
1959
Length
18 m (59.1 ft)
Max Span
3.7 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
460
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$419,000
Total Project Cost
$1,173,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.