U.S. 60 over SPRING RIVER

11.3 MI E US 69 · County 115, Oklahoma · Built 1940 · 2 Lanes · 5,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 5 Fair

Location

36.800014, -94.751297

This bridge is in worse condition than 67.2% of bridges in County 115. The average bridge in Oklahoma is 0 years old; this one is 86 years old.

Nearby Bridges

Bridge Details

Structure #
095440000000000
Year Built
1940
Length
167.6 m (549.9 ft)
Max Span
34.7 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
5,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,294,000
Total Project Cost
$8,235,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.