N4670 over CREEK

4.5 MI E OF SALLISAW · County 135, Oklahoma · Built 1940 · 2 Lanes · 250 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 5 Fair

Location

35.461372, -94.708178

This bridge is in worse condition than 75.2% of bridges in County 135. The average bridge in Oklahoma is 0 years old; this one is 86 years old.

Nearby Bridges

Bridge Details

Structure #
082880000000000
Year Built
1940
Length
11 m (36.1 ft)
Max Span
3 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
250
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$180,000
Total Project Cost
$285,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.