N2500 over CREEK
2 E SH 58 · County 015, Oklahoma · Built 1940 · 2 Lanes · 50 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 3 | Serious |
Location
35.400025, -98.535317
This bridge is in worse condition than 95.3% of bridges in County 015. The average bridge in Oklahoma is 0 years old; this one is 86 years old.
Nearby Bridges
Bridge Details
- Structure #
- 075190000000000
- Year Built
- 1940
- Reconstructed
- 1960
- Length
- 8.2 m (26.9 ft)
- Max Span
- 7.3 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $159,000
- Total Project Cost
- $251,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.