2602C over CREEK

3 MI N 4 E OF DUTTON · County 051, Oklahoma · Built 1939 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 6 Satisfactory

Location

35.247256, -98.021722

This bridge is in worse condition than 35.1% of bridges in County 051. The average bridge in Oklahoma is 0 years old; this one is 87 years old.

Nearby Bridges

Bridge Details

Structure #
070360000000000
Year Built
1939
Length
10.7 m (35.1 ft)
Max Span
5.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$168,000
Total Project Cost
$265,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.