E0120 over CREEK

6 S.E. OF FORAKER · County 113, Oklahoma · Built 1939 · 2 Lanes · 24 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 4 Poor
Superstructure 5 Fair
Substructure 5 Fair

Location

36.840139, -96.450608

This bridge is in worse condition than 83.7% of bridges in County 113. The average bridge in Oklahoma is 0 years old; this one is 87 years old.

Nearby Bridges

Bridge Details

Structure #
068360000000000
Year Built
1939
Length
8.2 m (26.9 ft)
Max Span
2.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
24
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$159,000
Total Project Cost
$251,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.