N1970 over CREEK
7.4 S 3. E OF MANGUM · County 055, Oklahoma · Built 1939 · 2 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
34.761075, -99.457717
This bridge is in worse condition than 45.2% of bridges in County 055. The average bridge in Oklahoma is 0 years old; this one is 87 years old.
Nearby Bridges
Bridge Details
- Structure #
- 067100000000000
- Year Built
- 1939
- Length
- 7.3 m (24 ft)
- Max Span
- 3 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $149,000
- Total Project Cost
- $236,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.