2226C over CREEK
4.2 E 2.5 N OF LEEDY · County 043, Oklahoma · Built 1939 · 2 Lanes · 50 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
35.905228, -99.274425
This bridge is in worse condition than 92.2% of bridges in County 043. The average bridge in Oklahoma is 0 years old; this one is 87 years old.
Nearby Bridges
Bridge Details
- Structure #
- 066420000000000
- Year Built
- 1939
- Length
- 6.4 m (21 ft)
- Max Span
- 3 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $100,000
- Total Project Cost
- $225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.