4036C over CREEK

4.2 E 2.5 S HEAVENER · County 079, Oklahoma · Built 1938 · 2 Lanes · 400 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 4 Poor

Location

34.85565, -94.536258

This bridge is in worse condition than 91.1% of bridges in County 079. The average bridge in Oklahoma is 0 years old; this one is 88 years old.

Nearby Bridges

Bridge Details

Structure #
062790000000000
Year Built
1938
Length
10.1 m (33.1 ft)
Max Span
3 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
400
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$177,000
Total Project Cost
$281,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.