E0870 over CREEK

3.9 W 1.0 N SH52-SH16 · County 111, Oklahoma · Built 1938 · 2 Lanes · 100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 4 Poor

Location

35.755206, -95.923992

This bridge is in worse condition than 83.3% of bridges in County 111. The average bridge in Oklahoma is 0 years old; this one is 88 years old.

Nearby Bridges

Bridge Details

Structure #
062490000000000
Year Built
1938
Length
9.1 m (29.9 ft)
Max Span
4 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$168,000
Total Project Cost
$265,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.