E0850 over CREEK

1.9 E CREEK C/L · County 111, Oklahoma · Built 1938 · 1 Lanes · 100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 5 Fair

Location

35.784389, -96.159667

This bridge is in worse condition than 65% of bridges in County 111. The average bridge in Oklahoma is 0 years old; this one is 88 years old.

Nearby Bridges

Bridge Details

Structure #
059330000000000
Year Built
1938
Length
7.3 m (24 ft)
Max Span
3 m
Width
5.5 m (18 ft)
Lanes
1
Daily Traffic
100
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$149,000
Total Project Cost
$236,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.