E0960 over CREEK

2. N .9 W OKFUSKEE · County 107, Oklahoma · Built 1938 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 5 Fair

Location

35.624567, -96.244775

This bridge is in worse condition than 71.2% of bridges in County 107. The average bridge in Oklahoma is 0 years old; this one is 88 years old.

Nearby Bridges

Bridge Details

Structure #
059290000000000
Year Built
1938
Length
7.3 m (24 ft)
Max Span
3.7 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$149,000
Total Project Cost
$236,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.