E0380 over CREEK

5N 1.3E OF LAHOMA · County 047, Oklahoma · Built 1938 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

36.463167, -98.064536

This bridge is in worse condition than 81.4% of bridges in County 047. The average bridge in Oklahoma is 0 years old; this one is 88 years old.

Nearby Bridges

Bridge Details

Structure #
058220000000000
Year Built
1938
Length
7.9 m (25.9 ft)
Max Span
3.7 m
Width
5.5 m (18 ft)
Lanes
2
Daily Traffic
50
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$156,000
Total Project Cost
$246,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.