E0380 over CREEK
5N 1.3E OF LAHOMA · County 047, Oklahoma · Built 1938 · 2 Lanes · 50 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
36.463167, -98.064536
This bridge is in worse condition than 81.4% of bridges in County 047. The average bridge in Oklahoma is 0 years old; this one is 88 years old.
Bridge Details
- Structure #
- 058220000000000
- Year Built
- 1938
- Length
- 7.9 m (25.9 ft)
- Max Span
- 3.7 m
- Width
- 5.5 m (18 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $156,000
- Total Project Cost
- $246,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.