D1485 over CREEK

2S 1E OF HEAVENER · County 079, Oklahoma · Built 1937 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 5 Fair

Location

34.863608, -94.577197

This bridge is in worse condition than 77.2% of bridges in County 079. The average bridge in Oklahoma is 0 years old; this one is 89 years old.

Nearby Bridges

Bridge Details

Structure #
054320000000000
Year Built
1937
Length
11.3 m (37.1 ft)
Max Span
3 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
100
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$188,000
Total Project Cost
$298,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.