E1450 over CREEK

2. S 3. W OF CABANISS · County 121, Oklahoma · Built 1937 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 5 Fair

Location

34.912625, -96.077461

This bridge is in worse condition than 83% of bridges in County 121. The average bridge in Oklahoma is 0 years old; this one is 89 years old.

Nearby Bridges

Bridge Details

Structure #
052080000000000
Year Built
1937
Length
6.7 m (22 ft)
Max Span
6.1 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$143,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.