U.S. 412 over CREEK

1.2 E JCT US 183 · County 153, Oklahoma · Built 1992 · 5 Lanes · 6,700 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
049200000000000
Year Built
1992
Length
19.2 m (63 ft)
Max Span
4.6 m
Width
31.1 m (102 ft)
Lanes
5
Daily Traffic
6,700
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$440,000
Total Project Cost
$1,231,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.