5702C over CREEK

.9 MI. E. OF GRAINOLA · County 113, Oklahoma · Built 1930 · 2 Lanes · 25 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
4
Poor

Condition Ratings

ComponentRatingDescription
Deck 4 Poor
Superstructure 5 Fair
Substructure 4 Poor

Location

36.941428, -96.636844

This bridge is in worse condition than 83.7% of bridges in County 113. The average bridge in Oklahoma is 0 years old; this one is 96 years old.

Nearby Bridges

Bridge Details

Structure #
031120000000000
Year Built
1930
Length
25.9 m (85 ft)
Max Span
6.4 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
25
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$292,000
Total Project Cost
$466,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.