E0730(141ST ST.) over COAL CREEK

0.1 MI E US 75 · County 143, Oklahoma · Built 1992 · 5 Lanes · 7,500 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
028350000000000
Year Built
1992
Length
13.7 m (44.9 ft)
Max Span
5.2 m
Width
24.4 m (80.1 ft)
Lanes
5
Daily Traffic
7,500
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$100,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.