N3920 over CREEK

1.9S .2W OF DUSTIN · County 063, Oklahoma · Built 1921 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

35.245267, -96.034572

This bridge is in worse condition than 76.9% of bridges in County 063. The average bridge in Oklahoma is 0 years old; this one is 105 years old.

Nearby Bridges

Bridge Details

Structure #
011900000000000
Year Built
1921
Length
11.3 m (37.1 ft)
Max Span
10.7 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Arch - Deck
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$188,000
Total Project Cost
$298,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.