E1270 over CREEK

1.5N 2.6W OF SENTINEL · County 149, Oklahoma · Built 1921 · 2 Lanes · 25 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 5 Fair

Location

35.174644, -99.231

This bridge is in worse condition than 85.9% of bridges in County 149. The average bridge in Oklahoma is 0 years old; this one is 105 years old.

Nearby Bridges

Bridge Details

Structure #
011780000000000
Year Built
1921
Length
7.3 m (24 ft)
Max Span
6.7 m
Width
5.6 m (18.4 ft)
Lanes
2
Daily Traffic
25
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$146,000
Total Project Cost
$230,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.