E1860 over CREEK

1.5S 5.3W OF HOLLISTER · County 141, Oklahoma · Built 1920 · 2 Lanes · 30 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 5 Fair

Location

34.319614, -98.962739

This bridge is in worse condition than 93% of bridges in County 141. The average bridge in Oklahoma is 0 years old; this one is 106 years old.

Nearby Bridges

Bridge Details

Structure #
007630000000000
Year Built
1920
Length
7 m (23 ft)
Max Span
3 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
30
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$136,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.