S.H. 11 over DEER CREEK
0.1 MI E GRANT C/L · County 071, Oklahoma · Built 1918 · 2 Lanes · 2,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
36.810872, -97.460336
This bridge is in worse condition than 81.9% of bridges in County 071. The average bridge in Oklahoma is 0 years old; this one is 108 years old.
Nearby Bridges
Bridge Details
- Structure #
- 005170000000000
- Year Built
- 1918
- Reconstructed
- 1931
- Length
- 6.2 m (20.3 ft)
- Max Span
- 5.9 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $400,000
- Total Project Cost
- $1,120,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.