USR 23 NB over HONEY RUN

1.52 mi. South of SR 294 · County 175, Ohio · Built 1966 · 2 Lanes · 8,628 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
8800219
Year Built
1966
Length
18.3 m (60 ft)
Max Span
6.1 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
8,628
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.