JERRY CITY ROAD over E.BR.PRTG.R.JERRY CITY R

.1 MI.W. OF U.S.ROUTE 199 · County 173, Ohio · Built 2002 · 2 Lanes · 359 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
8736871
Year Built
2002
Length
24.7 m (81 ft)
Max Span
9.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
359
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$337,000
Total Project Cost
$375,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.