I80 OH TPK over PACKER CREEK DITCH

2.2MI EAST OF EXIT 5 · County 173, Ohio · Built 1954 · 6 Lanes · 44,219 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
8729891
Year Built
1954
Length
18 m (59.1 ft)
Max Span
6.1 m
Lanes
6
Daily Traffic
44,219
Material
Concrete
Design
Culvert
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.