TR 248 over IR 75

2.5 Mi. N. of SR 64 · County 173, Ohio · Built 1969 · 2 Lanes · 324 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
8703930
Year Built
1969
Length
85.6 m (280.8 ft)
Max Span
25 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
324
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.