SR 64 over MAUMEE RIVER

2.0 Mi. South of US 24 · County 173, Ohio · Built 2020 · 2 Lanes · 11,900 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
8702463
Year Built
2020
Length
295.3 m (968.8 ft)
Max Span
36.1 m
Width
17.3 m (56.8 ft)
Lanes
2
Daily Traffic
11,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.