CR 34 (21/N) over TIFFIN RIVER

07400 RD 21/N · County 171, Ohio · Built 1999 · 2 Lanes · 677 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
8632820
Year Built
1999
Length
50.3 m (165 ft)
Max Span
16.8 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
677
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.