SR 576 over W BR ST JOSEPH RIVER

2.81 mi. South of OH/MI · County 171, Ohio · Built 1961 · 2 Lanes · 1,070 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
8603219
Year Built
1961
Reconstructed
2014
Length
52.4 m (171.9 ft)
Max Span
19.8 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
1,070
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.