COUNTY ROAD 225 over S. BRANCH SALT CREEK
150 FEET N. OF CR109 · County 169, Ohio · Built 2024 · 2 Lanes · 470 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
40.675689, -81.8177
This bridge is in worse condition than 2.8% of bridges in County 169. The average bridge in Ohio is 0 years old; this one is 2 years old.
Nearby Bridges
COUNTY ROAD 109 over S. BRANCH OF SALT CREEK
Built 1998
TOWNSHIP ROAD 608 over SALT CREEK
Built 1970
COUNTY ROAD 109 over S. BRANCH SALT CREEK
Built 1994
TWP. ROAD 197 over BRANCH OF SALT CREEK
Built 1995
TWP. ROAD 44 over S BRANCH OF SALT CREEK
Built 1984
COUNTY ROAD 235 over SALT CREEK
Built 1992
COUNTY ROAD 94A over BRANCH OF SALT CREEK
Built 1960
COUNTY ROAD 94A over BRANCH OF SALT CREEK
Built 1984
TWP. ROAD 109 over N. BRANCH SALT CREEK
Built 1974
COUNTY ROAD 109 over S. BRANCHY OF SALT CREEK
Built 1990
Bridge Details
- Structure #
- 8553181
- Year Built
- 2024
- Length
- 14.7 m (48.2 ft)
- Max Span
- 12.7 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 470
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $368,676,000
- Total Project Cost
- $470,176,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.