COUNTY ROAD 30A over MUDDY FORK

0.2 MI. E. OF CR93 · County 169, Ohio · Built 1965 · 2 Lanes · 632 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
8550573
Year Built
1965
Length
36.1 m (118.4 ft)
Max Span
13.7 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
632
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.