SUMMIT ST. over SUGAR CREEK

160 FT. S. OF SR585 · County 169, Ohio · Built 1965 · 2 Lanes · 202 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
8545049
Year Built
1965
Length
22.3 m (73.2 ft)
Max Span
8.4 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
202
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.