TWP. ROAD 34 over MILLBROOK RUN

0.4 MI. W. OF SR226 · County 169, Ohio · Built 1900 · 2 Lanes · 132 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
8537607
Year Built
1900
Reconstructed
1992
Length
14.9 m (48.9 ft)
Max Span
14.7 m
Width
5.6 m (18.4 ft)
Lanes
2
Daily Traffic
132
Material
Steel
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$292,000
Total Project Cost
$349,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.