SR 57 over BR OF CHIPPEWA CREEK

0.42 MILES SOUTH OF SR585 · County 169, Ohio · Built 1958 · 2 Lanes · 7,913 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
8502676
Year Built
1958
Length
18.3 m (60 ft)
Max Span
6.1 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
7,913
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.