RED LION-FIVE POIN over CLEAR CREEK

0.02 mi N of CR 41 · County 165, Ohio · Built 1989 · 2 Lanes · 1,666 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
8335176
Year Built
1989
Length
51.8 m (169.9 ft)
Max Span
27.7 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
1,666
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.