MURDOCH-GOSHEN ROA over GROG RUN

0.89 mi S of SR 48 · County 165, Ohio · Built 1944 · 2 Lanes · 2,070 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
8330530
Year Built
1944
Reconstructed
1991
Length
9.4 m (30.8 ft)
Max Span
8.8 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
2,070
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$50,000
Total Project Cost
$55,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.