IR 75 over SR 73

OVER SR 73 · County 165, Ohio · Built 2009 · 4 Lanes · 47,049 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
8303827
Year Built
2009
Length
50.7 m (166.3 ft)
Max Span
25 m
Width
24.1 m (79.1 ft)
Lanes
4
Daily Traffic
47,049
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.