IR75 over SHAKER CREEK

.2 MI N OF MONROE CORP · County 165, Ohio · Built 2010 · 8 Lanes · 102,957 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
8303223
Year Built
2010
Length
24.2 m (79.4 ft)
Max Span
9.1 m
Width
49.7 m (163.1 ft)
Lanes
8
Daily Traffic
102,957
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.