SR 349 over STREAM

0.57M N JACKSON CO. LINE · County 163, Ohio · Built 1958 · 2 Lanes · 739 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
8203008
Year Built
1958
Length
30.2 m (99.1 ft)
Max Span
11.3 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
739
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.