SR 328 over BRUSHY CREEK (RACCOON)

2.3 M N OF JCT SR 93 · County 163, Ohio · Built 1982 · 2 Lanes · 86 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
8202532
Year Built
1982
Reconstructed
2014
Length
34.4 m (112.9 ft)
Max Span
11.5 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
86
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.