HARRISON-WILLSHIRE over LILLICH DITCH

3.15 MI N JCT SR 81 · County 161, Ohio · Built 2024 · 2 Lanes · 145 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
8138223
Year Built
2024
Length
12.2 m (40 ft)
Max Span
11.1 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
145
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.