OH 800 over Stillwater Creek

0.11 Mi South of USR 36 · County 157, Ohio · Built 1952 · 2 Lanes · 6,130 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
7905432
Year Built
1952
Reconstructed
2006
Length
65 m (213.3 ft)
Max Span
24.4 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
6,130
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$475,000
Total Project Cost
$587,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.